The Buffalo Pound Water Treatment Plant Electrical Capital Upgrade Project
Sector: Water Supply and Storage • Location: Saskatchewan, Canada
Source: Infrastructure Canada
The purpose of the project is to replace the Buffalo Pound Water Treatment Plant’s electrical substation, backup generators and upgrade the raw water pumps as these assets have reached the end of their life cycle and are starting to experience failures.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about The Buffalo Pound Water Treatment Plant Electrical Capital Upgrade Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to replace the Buffalo Pound Water Treatment Plant’s electrical substation, backup generators and upgrade the raw water pumps as these assets have reached the end of their life cycle and are starting to experience failures. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
