The Catholic University of Korea, Eunpyeong St. Mary's Hospital
Sector: Commercial • Location: South Korea
Source: Hyundai Engineering
Hyundai E&C builds the biggest general hospital in the northwestern part of SeoulHospitals are considered specialized building structures which cutting-edge medical devices and advanced facilities are all integrated into to deal with human life. Hyundai E&C has been well recognized thanks to its experience amassed from the construction of about 50 hospitals at home and abroad.Eunpyeong St. Mary’s
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Hyundai E&C builds the biggest general hospital in the northwestern part of SeoulHospitals are considered specialized building structures which cutting-edge medical devices and advanced facilities are all integrated into to deal with human life. Hyundai E&C has been well recognized thanks to its experience amassed from the construction of about 50 hospitals at home and abroad.Eunpyeong St. Mary’s Hospital is the 9th affiliated hospital of the Catholic Medical Center network and the 4th affiliated hospital of the CMC network built by Hyundai E&C. The new CMC hospital project is to build a main building of 17 floors above ground and seven basement levels and an annex of eight floors above ground and five basement levels with 178,624 square meters of total floor area. Construction costs about 301.2 billion won, and Hyundai E&C has a 100 percent share of the project.The construction began on October 28, 2016. Currently, the builder is working on exterior and interior finishing. As of now, 59 percent of the construction was completed.Hyundai E&C made special efforts in designing Eunpyeong St. Mary’s Hospital to offer up-to-date, eco-friendly facilities and satisfy the stronger standards for infection management. Along with the clean room system and the air conditioning system designed to prevent bacterial infection and transmission, the builder applied the double door design to isolation rooms in the emergency center, the first of its kind in the country, and built negative pressure rooms at the Outpatient Clinic of Infectious Diseases. In addition, it constructed screen doors for all wards in a bid to fend off nosocomial infection.Above all things, the construction site devoted its most efforts to electric work on the ground that any possible power failure may threaten life of patients. To prepare for blackout, it built double power lines. Even when a failure in one power line occurs, the other can supply power to the hospital.The Eunpyeong St. Mary’s Hospital project made the possible out of the impossible. As for construction period, the project was originally scheduled to be finished in February 2019, but it has to be completed in 26 months on December 28 this year due to completion approval. What’s worse is that the delayed construction permits in the early stage led the construction to be three months behind schedule. In order to solve this problem, the construction site set out to change construction methods and rush the construction work.The construction site pays full attention to achieve “safety,” “quality” and “timely completion.” As part of this effort, it required workers to record the details of working with fire on a board on a daily basis, which led to preventing major accidents from occurring.As 59 percent of the construction was completed as of June 11, about six months are left until completion approval. Eunpyeong St. Mary’s Hospital is expected to serve as the largest medical institution in the northwestern part of Seoul and the northern area of Gyeonggi-do. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |