logo
ProjectCompleted

The Cove

The owner, status and timeline of this project. A free account opens every field.

Source: Engineering News-Record | ENR

The Cove is a mixed-use residential and hospitality project located in Worcester's emerging Canal District, adjacent to the Polar Park baseball stadium. It features over 170 upscale, market-rate apartments with a mix of studios, one-bedroom, and two-bedroom units, many with patios and terraces overlooking the stadium. The ground level includes 16,000 sq ft of retail space anchored by a restaurant,

Status
Closed
Sector
Stadium, Residential, Water Supply and Storage, Car parking, Warehouse, Automotive
Location
Worcester, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Engineering News-Record | ENR

ConstructChat

Ask ConstructChat about The Cove

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “The Cove” is an infrastructure initiative in the Stadium sector, located in Worcester, Massachusetts, United States. Taiyo aggregates data on it from Engineering News-Record | ENR.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Cove is a mixed-use residential and hospitality project located in Worcester's emerging Canal District, adjacent to the Polar Park baseball stadium. It features over 170 upscale, market-rate apartments with a mix of studios, one-bedroom, and two-bedroom units, many with patios and terraces overlooking the stadium. The ground level includes 16,000 sq ft of retail space anchored by a restaurant, bar, and candlepin bowling alley. Amenities include nearly 100 structured parking spaces, fitness center, co-working lounges, fire pits, communal kitchen and lounge, and outdoor patios overlooking the ballpark. The project involved soil remediation, a robust foundation support system beneath the water table, and faced challenges such as supply chain delays and construction pauses due to adjacent stadium events. Despite these, the project was completed on schedule and within budget.

Original sector

Built Environment

Location

Country

United States of America (USA)

State

Massachusetts

City

Worcester

Source

Source

Engineering News-Record | ENR

URL

More Details

Record type

Project

Sector

Stadium, Residential, Water Supply and Storage, Car parking, Warehouse, Automotive

Article published date

2025-11-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project