logo

The Droves Solar Farm

Sector: Power Generation (CCGT) • Location: Swaffham, Norfolk, United Kingdom

Source: Daily Express

Project
Planned

A huge solar farm planned for land near RAF Marham in Norfolk, spanning 2,075 acres (equivalent to 1,175 football pitches). The project aims to generate up to 500 megawatts of electricity, enough to power around 115,000 homes a year. However, the Ministry of Defence has warned that the solar farm could interfere with radar at the RAF airbase and pose hazards such as glare and birdstrike risks.

Status
Prospective
Sector
Power Generation (CCGT), Solar, Raw Materials
Location
Swaffham, Norfolk, United Kingdom
Updated
22 Jul 2026
Source
Daily Express

ConstructChat

Ask ConstructChat about The Droves Solar Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “The Droves Solar Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Swaffham, Norfolk, United Kingdom. Taiyo aggregates data on it from Daily Express.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A huge solar farm planned for land near RAF Marham in Norfolk, spanning 2,075 acres (equivalent to 1,175 football pitches). The project aims to generate up to 500 megawatts of electricity, enough to power around 115,000 homes a year. However, the Ministry of Defence has warned that the solar farm could interfere with radar at the RAF airbase and pose hazards such as glare and birdstrike risks.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

Norfolk

City

Swaffham

Source

Source

Daily Express

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Raw Materials

Article published date

2026-05-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project