The Forest (9th and John) Mixed Use Development
Sector: Commercial • Location: Seattle, Washington, United States of America
Source: Dodge USA
proposing a 28-story building containing 278 residential units. Parking for 248 vehicles to be located below grade. 9,400 sq ft indoor residential amenity space - 5300 sq ft street level retail - Existing buildings to be demolished.
- Status
- Under Construction
- Sector
- Commercial, Steel, Car parking, Automotive, Road, Residential, Raw Materials
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about The Forest (9th and John) Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | proposing a 28-story building containing 278 residential units. Parking for 248 vehicles to be located below grade. 9,400 sq ft indoor residential amenity space - 5300 sq ft street level retail - Existing buildings to be demolished. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Steel, Car parking, Automotive, Road, Residential, Raw Materials |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
