The Gambia - The Gambia Electricity System Rehabilitation and Expansion Project (GESREP)

Sector: Water Supply and Storage • Location: Gambia

Source: African Development Bank (AfDB)

Project

The Gambia Electricity Grid Rehabilitation and Extension Project (GESREP) aims to improve access to electricity and ensure reliability of electricity supply. The project will provide last-mile connection equipment, including prepaid meters, and allow poor households to connect and manage their own consumption without the risk of physical disconnection that could occur due to unpaid monthly bills.

Project Information FAQ

Project Information

4 Q
The project “The Gambia - The Gambia Electricity System Rehabilitation and Expansion Project (GESREP)” is an infrastructure initiative in the Water Supply and Storage sector, located in Gambia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Gambia Electricity Grid Rehabilitation and Extension Project (GESREP) aims to improve access to electricity and ensure reliability of electricity supply. The project will provide last-mile connection equipment, including prepaid meters, and allow poor households to connect and manage their own consumption without the risk of physical disconnection that could occur due to unpaid monthly bills. Strengthening the distribution network under the proposed project will increase productivity, stimulate economic growth and contribute to The Gambia's efforts to achieve universal access to electricity. The project will also contribute to strengthening the capacity of the National Electricity and Water Company (NAWEC) in the operation and maintenance of electrical installations. The proposed project finances three (03) main components: firstly, it will finance the construction of two (2) new 33/11kV substations, the upgrading, rehabilitation and reinforcement of two (2) 33/11kV substations; the rehabilitation and upgrading of low voltage distribution lines (140km) as well as the installation of 10 compact 11/0.4kV substations and 100 distribution transformers in the Banjul metropolitan area. The project contributes to climate finance, with 10 million USD of the total approved amount dedicated to mitigation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data