The Gateway Mixed-Use Tower
Delayed · Connecticut · Last reported Apr 2024
Source: Dodge USA
Redevelop the northern 1.92 acres of the Property referred to as the Visitors Lot by removing the existing surface parking lot and constructing a 34-story mixed-use building containing 406 residential units, 36,880 sq. ft. of ground-floor retail space and 537 parking spaces with associated tenant amenity space and other related improvements - total SF is estimated
- Status
- Failure
- Sector
- Commercial, Car parking, Consumer Products, Residential, Automotive, Steel
- Location
- Stamford, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about The Gateway Mixed-Use Tower
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Redevelop the northern 1.92 acres of the Property referred to as the Visitors Lot by removing the existing surface parking lot and constructing a 34-story mixed-use building containing 406 residential units, 36,880 sq. ft. of ground-floor retail space and 537 parking spaces with associated tenant amenity space and other related improvements - total SF is estimated |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Stamford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Consumer Products, Residential, Automotive, Steel |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
