The Hill Mixed-Use Residential Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The 2.17-acre site would consist of two long buildings -- one along Fifth Avenue and another along Colwell Street. In total, they would include 6,600 square feet of retail, 152 parking spaces, 112 bike racks, and furnished studio, one-bedroom, two-bedroom and three-bedroom apartments. 260 apartments and 11,000 square feet of commercial space. Building A 143,300 Total Building GSF 12,700 SF Amenity
- Status
- Prospective
- Sector
- Road, Car parking, Automotive, Consumer Products, Steel, Manufacturing (Industrial), Commercial, Residential
- Location
- Pittsburgh, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about The Hill Mixed-Use Residential Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The 2.17-acre site would consist of two long buildings -- one along Fifth Avenue and another along Colwell Street. In total, they would include 6,600 square feet of retail, 152 parking spaces, 112 bike racks, and furnished studio, one-bedroom, two-bedroom and three-bedroom apartments. 260 apartments and 11,000 square feet of commercial space. Building A 143,300 Total Building GSF 12,700 SF Amenity + Common 6,400 SF Retail 105 Units @ 962 Average NRSF Building B 225,200 Total Building GSF 2,30... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Pittsburgh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Automotive, Consumer Products, Steel, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
