logo

The Keeyask Generation Project, Manitoba, Canada

Sector: Cement • Location: Canada

Source: Bechtel

Project
Close

The Keeyask Generation Project,Harnessing the power of one of Canada’s great river systems

In 2014, the Bechtel-led BBE Hydro Constructors Limited Partnership began laying the groundwork for this new 695-megawatt powerhouse. As the centerpiece of The Keeyask Generation Project’s seven turbine units will provide enough renewable energy to power 400,000 homes.

BBE is formed of Bechtel Canada in p

Project Information FAQ

Project Information

4 Q
The project “The Keeyask Generation Project, Manitoba, Canada” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Keeyask Generation Project,Harnessing the power of one of Canada’s great river systems In 2014, the Bechtel-led BBE Hydro Constructors Limited Partnership began laying the groundwork for this new 695-megawatt powerhouse. As the centerpiece of The Keeyask Generation Project’s seven turbine units will provide enough renewable energy to power 400,000 homes. BBE is formed of Bechtel Canada in partnership with Montana-based Barnard Construction Company and Canadian contractor EllisDon. The Keeyask project involves massive cast-in-place concrete structures—chiefly a spillway and the powerhouse structure—totaling more than 345,000 cubic yards (330,000 cubic meters). BBE’s work also includes about 1.4 miles (2.2 kilometers) of earth-filled dams and 14 miles (23 kilometers) of earthen dikes. The consortium is currently constructing cofferdams that will be pumped out to create dry work areas for the powerhouse, the spillway, and other structures.  A river runs through it The Nelson, Canada’s fourth-longest river, runs 1,600 miles (2,575 kilometers) from Lake Winnipeg north to Hudson Bay, draining one of the largest watersheds in North America. Its elevation drop of 650 feet (198 meters) over 400 miles (644 kilometers)—and its enormous volume as the last leg in the Saskatchewan, Red, and Winnipeg River systems—make it ideal for hydropower generation. This past summer, the volume of water at Keeyask totaled some 212,000 cubic feet (6,003 cubic meters) per second—more than twice the flow of Niagara Falls.  In fact, three power stations on the lower Nelson downstream from Keeyask—Limestone being the largest—already supply about 75 percent of the province’s electricity. Featured stories Mega Canadian Hydro Project Moves Forward Despite Surprises, Bitter ColdOctober in northern Manitoba means daily dips into subzero temperatures and frequent dustings of snow. For most construction jobsites, it also might mean it’s time to start sending workers home until temperatures rise again in the late spring. Not at Keeyask.  Project UpdateSee the progress on this incredi ble project. Experience countsIn the early 1990s, Bechtel delivered the 10-unit, 1,330-megawatt Limestone hydroelectric generating station on Manitoba’s powerful Nelson River under budget and ahead of schedule. Project gallery Project Filters

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data