logo

The longest-life & energy-saving emergency LED lighting system for underground infrastructures

Sector: Raw Materials • Location: Sweden

Source: EU Funding & Tenders Portal

Project
Ended

During rail and road tunnel construction/refurbishment, the initial investment required for lighting system installation, including emergency lighting systems (ELS) amounts to an average 6% of total tunnel construction cost. Current ELS power supply circuits force lights to remain on for long hours when not needed: when power is turned off manually, existing circuits keep ELS on (powered by batter

Project Information FAQ

Project Information

3 Q
The project “The longest-life & energy-saving emergency LED lighting system for underground infrastructures” is an infrastructure initiative in the Raw Materials sector, located in Sweden. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

During rail and road tunnel construction/refurbishment, the initial investment required for lighting system installation, including emergency lighting systems (ELS) amounts to an average 6% of total tunnel construction cost. Current ELS power supply circuits force lights to remain on for long hours when not needed: when power is turned off manually, existing circuits keep ELS on (powered by batteries). This leads to needless energy consumption and fast battery deterioration. We, at Uni-light LED, have developed Smartunnel, a new smart LED ELS for tunnels under construction/refurbishment, which turns off when light is not needed. Our smart switch and intelligent control allow discrimination between unintentional power outage and intentional interruption, so that emergency lights are lit only under the first scenario. This prevents excessive battery exhaustion/recharging cycles thus making Smartunnel the longest-life ELS on the market (10 years, 80% reduction in battery waste). Smartunnel offers 20-30% increased energy efficiency leading to effective savings of €13,000/3km per year. Our flicker-free and electromagnetic interference-free lights improve visibility and reduce health issues, enhancing safety and security for tunnel workers. Conveniently, Smartunnel can use existing wiring installations to power emergency lights, curbing the cost of new wiring in existing tunnels. We already commercialise 7 lighting product types, based on our patented LED light Driver and Thermal Management Technology for illumination in agriculture, industry and on ships, thus far reaching 100 companies in the UK, Sweden, Germany and Austria. The success of our existing systems has funded Smartunnel development. Following the optimisation of our design into a pilot for phase 2 validation under real conditions. We aim to achieve a tunnelling construction market share of 21 % in Europe as well as 8 % in USA by 2024, creating at least 20 new jobs at Uni-light LED in the process.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data