logo
ProjectClosed

The Office / James & Mau

Closed · Niepołomice · Last reported Feb 2023

Source: ArchDaily

A smaller part of the program is distributed on the second floor to occupy less of the existing green area. In this way, a volume of offices emerges, abstracted from the hostile environment thanks to the retreat of the entire perimeter.The western façade is adjacent to the industrial zone and therefore houses the services or less occupied uses closing it with hardly any gaps. The other three façad

Status
Closed
Sector
Geothermal, Solar, Manufacturing (Industrial), Car parking, Residential, Metal, Commercial, Warehouse, Automotive
Location
Poland
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about The Office / James & Mau

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “The Office / James & Mau” is an infrastructure initiative in the Geothermal sector, located in Niepołomice. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A smaller part of the program is distributed on the second floor to occupy less of the existing green area. In this way, a volume of offices emerges, abstracted from the hostile environment thanks to the retreat of the entire perimeter.The western façade is adjacent to the industrial zone and therefore houses the services or less occupied uses closing it with hardly any gaps. The other three façades house uses rooms, offices, and staff apartments and has large windows to capture light and metal louvers that control the solar incidence avoiding it in summer and capturing it in winter.On the ground floor, there are two “thermal buffer” spaces with double-glazed facades which thanks to solar control of the louvers are heated in winter and cooled in summer. It is through them that the clean outdoor air is pre climatized before entering the interior for less energy consumption. It is a passive alternative to heat recovery machines for ventilation, or what is the same “thermal buffer” spaces become such machines that can also be used and enjoyed by users as greenhouses or terraces in which to rest, eat, chat, etc.Text description provided by the architects.The available land is a green area on a large flat industrial plot surrounded by an industrial building, a parking lot for employees, a truck yard, and a small office building that gives access to the enclosure.The new building splits the existing green area into three parts, to which the northern, southern, and eastern façades are looking, but especially towards which the boundaries of the building are extended by thick walls. These create exterior enclosures that act as a buffer between office and industrial work, generating the feeling that beyond the building everything is green, forgetting the environment around us. The latter is enhanced by the use of a nontypical industrial facade material such as brick.Precisely next to this last one, there is a small forest of trees which we decided to maintain and use as a physical antechamber of the new building but above all as a psychological generator of the project. In such a hostile environment we wanted office work to be a purifying refuge from the environment beyond the mere office building.

Location

Country

Poland

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Geothermal, Solar, Manufacturing (Industrial), Car parking, Residential, Metal, Commercial, Warehouse, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project