The Pelham Condominiums
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
(2) buildings with (14) units each - Within each building, two (2) dwellings are proposed to be 3-bedroom units and twelve (12) dwellings as 2-bedroom units - (40) underground parking spaces - (20) for each building - (16) surface parking spaces - A landscaped area is proposed with trails, rain gardens, benches in the area between the back of the buildings and Mill Creek
- Status
- Prospective
- Sector
- Commercial, Residential, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Dexter, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about The Pelham Condominiums
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | (2) buildings with (14) units each - Within each building, two (2) dwellings are proposed to be 3-bedroom units and twelve (12) dwellings as 2-bedroom units - (40) underground parking spaces - (20) for each building - (16) surface parking spaces - A landscaped area is proposed with trails, rain gardens, benches in the area between the back of the buildings and Mill Creek |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Dexter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
