logo

The Reclamation Youth Conservation Program: Lake Berryessa Trail Construction

Sector: Broadband • Location: United States of America

Source: Grants.gov

Project
Archived

The Bureau of Reclamation, Mid-Pacific Region, intends to issue a Funding Opportunity Announcement (FOA) for a Cooperative Agreement pursuant to the authority of The Public Lands Corps Act of 1993, (16 U.S.C.§§ 1721-1730), and the Youth Conservation Corps Act of 1970 (16 U.S.C. §§1701-06) as delegated to Reclamation through memorandum dated January 21, 2010 from Commissioner, Michael L. Conner.The

Project Information FAQ

Project Information

5 Q
The project “The Reclamation Youth Conservation Program: Lake Berryessa Trail Construction” is an infrastructure initiative in the Broadband sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bureau of Reclamation, Mid-Pacific Region, intends to issue a Funding Opportunity Announcement (FOA) for a Cooperative Agreement pursuant to the authority of The Public Lands Corps Act of 1993, (16 U.S.C.§§ 1721-1730), and the Youth Conservation Corps Act of 1970 (16 U.S.C. §§1701-06) as delegated to Reclamation through memorandum dated January 21, 2010 from Commissioner, Michael L. Conner.The objective of the competitive solicitation is to ensure compliance with competition requirements related to Federal financial agreements and to ensure public participation in the Reclamation Youth Conservation Program.The project location will be Lake Berryessa, Solano Project Lands, Napa County, CA. The applicant will furnish a work crew comprised of 6 young adults (ages 18-25), plus a crew leader qualified to perform duties related to trail construction of a 3.2 mile accessible trail segment. Crews must possess the knowledge, skills and abilities related to trail construction, resource protection, project management, safety, and equipment operation. Types of work to be performed include but are not limited to:Cutting, clearing, grubbing, and removing soil, roots, and rocks along a predefined alignment; Cut and remove or chip brush, branches and shrub vegetation; Resource protection and erosion control measures; Protection from injury or defacement of trees; Construction of wet crossings, boardwalks, bridges, retaining walls and other similar structures involved in trail construction; Mow non-woody vegetation with a mower or string trimmer; Hauling or moving of gravel, rock and other materials; Seeding or restoration work related to mitigation; Tree Planting; Sign Installation.Recipient will furnish crew with a reliable transportation vehicle, supervision, personal protective equipment (PPE), communication equipment (cell phone or radio), first aid kit, and hand tools necessary to perform the work. Such tools include but are not limited to shovels, loppers, pruners, rakes, McClouds, Polaskis, axes, wheelbarrows, utility trailer and tarp or other covering, backpack water pumps and/or other water sources. The recipient shall be required to provide power tools and fuel as necessary, such as chain saws, string trimmers, mowers, and leaf blowers, including additional supplies required to perform trail work. The recipient is responsible for crew safety and proper operation of all equipment and tools. The recipient is responsible for ensuring wildfires do not occur as a result of work underway or completed by the work crew. No housing will be provided as the location of work is within commutable distance of urban areas, and commercial sources of housing are available in the immediate area. Campsites within developed recreation areas, or an area in which to set up a crew camp, may be available dependent upon time of year and size of project crew. Recipient is responsible for provision of portable toilets at the work sites as needed, as well as furnishing housing and/or camping equipment, sanitary and kitchen facilities. Period of Performance is from the date of issuance of the Agreement to approximately September 30, 2014. FOA R12FA20027 will be posted on the GRANTS.GOV web site, at www.grants.gov, on or about July 6, 2012. The estimated date for receipt of proposals is on July 27, 2012. The FOA must be downloaded at the above web site. No paper copy of this announcement will be distributed. Central Contractor Registration (CCR) applied to this FOA. Prospective recipients must be registered prior to award. Lack of registration in the CCR database will make an offeror ineligible for award. Information on CCR registration can be obtained via the Internet at http://www.ccr.gov. Questions concerning this FOA should be directed to Beverly S. Breen at bbreen@usbr.gov.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data