The Residences at Forman Farms - Townhomes
Sector: Raw Materials • Location: Freehold, New Jersey, United States of America
Source: Dodge
280 units - 224 three-bedroom market rate townhomes and 56 affordable stacked townhome units (11 one-bedroom, 33 two-bedroom, and 12 three-bedroom) within approximately 38 buildings, along with associated improvements including roadways - SF is a Dodge Estimate
- Status
- Prospective
- Sector
- Raw Materials, Manufacturing (Industrial), Commercial, Residential
- Location
- Freehold, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about The Residences at Forman Farms - Townhomes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 280 units - 224 three-bedroom market rate townhomes and 56 affordable stacked townhome units (11 one-bedroom, 33 two-bedroom, and 12 three-bedroom) within approximately 38 buildings, along with associated improvements including roadways - SF is a Dodge Estimate |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Freehold |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
