The Shores at Tranquility Clubhouse & Pool (Titusville, FL)
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
New Construction of a 12,327 sf. Clubhouse - New Construction of Guard House - New Construction of Entrance Tower and Sign - Site Improvements & Sitework of 3.694 ACRES. - Sitework, underground utilities, Paving, Surveying, Materials Testing, Hardscape, Landscape & Irrigation, Masonry, Concrete, Structural Steel & Metal decking, Metal Railings, Metal Fencing, 6 opaque Fencing, Precast Permadact Ba
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Forest Products and Packaging, Metal, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial), Rail, Steel
- Location
- Titusville, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about The Shores at Tranquility Clubhouse & Pool (Titusville, FL)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding-Invitation |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Construction of a 12,327 sf. Clubhouse - New Construction of Guard House - New Construction of Entrance Tower and Sign - Site Improvements & Sitework of 3.694 ACRES. - Sitework, underground utilities, Paving, Surveying, Materials Testing, Hardscape, Landscape & Irrigation, Masonry, Concrete, Structural Steel & Metal decking, Metal Railings, Metal Fencing, 6 opaque Fencing, Precast Permadact Balustrades and Guardrails Lumber, Rough Carpentry, Floor & Roof Trusses, Cabinets/Millwork, Counte... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Titusville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Forest Products and Packaging, Metal, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial), Rail, Steel |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
