Project Bouygues Energies & Services, a subsidiary of Bouygues Construction, built the thermal power plant on the Caribbean island of St Martin. The design-build contract signed with EDF comprised engineering studies, procurement, transport and the commissioning of the plant. It now provides power for the French half of the island. Challenge One of the biggest challenges in the p

Project Information FAQ

Project Information

5 Q
The project “The St Martin thermal power plant” is an infrastructure initiative in the Commercial sector, located in France. Taiyo aggregates data on it from Bouygues.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project Bouygues Energies & Services, a subsidiary of Bouygues Construction, built the thermal power plant on the Caribbean island of St Martin. The design-build contract signed with EDF comprised engineering studies, procurement, transport and the commissioning of the plant. It now provides power for the French half of the island. Challenge One of the biggest challenges in the project came in the logistics required to transport the engines, each weighing 175 tonnes. Equipment could not be moved directly using cranes due to the island’s topology. Specific logistical organisation was put in place for handling operations. Bouygues Energies & Services’ experience in managing projects in isolated areas (particularly in the “energy boulevard” project in the Republic of the Congo, the Gabon interconnected network, etc.) were key success factors for the project. Innovation The use of 3D design made it possible to coordinate the technical packages in order to prepare for construction and operation with the greatest possible degree of accuracy. The power plant is operated using a SCADA (Supervisory Control And Data Acquisition) system, an ultra-modern remote-control and remote-monitoring system. A training programme for EDF and for local companies involved was organised, to help them operate the power station using the latest technology. Responsible « We wanted an accident-free construction site », stated Gino Gauthier, Executive Vice President at Bouygues Energies & Services, adding that there was be a supervisor at the construction site with the sole role of ensuring compliance with safety regulations (wearing hard hats, regulation footwear and clothing, etc.). Failure to adhere to safety regulations at the construction site was grounds for dismissal. Environment The construction site was not only exemplary with regard to safety. In addition, it was awarded the Ecosite label, rewarding the commitment of all those involved in the project to respecting the environment. Ecosite is awarded by Bouygues Construction’s sustainable development department on the basis of an audit analysing specific criteria and defining the environmental standards to be met, such as managing waste and hazardous materials, reducing noise pollution, air quality, respect for biodiversity, reducing energy consumption, etc.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data