The St Martin thermal power plant
Sector: Commercial • Location: France
Source: Bouygues
Project Bouygues Energies & Services, a subsidiary of Bouygues Construction, built the thermal power plant on the Caribbean island of St Martin. The design-build contract signed with EDF comprised engineering studies, procurement, transport and the commissioning of the plant. It now provides power for the French half of the island. Challenge One of the biggest challenges in the p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Project Bouygues Energies & Services, a subsidiary of Bouygues Construction, built the thermal power plant on the Caribbean island of St Martin. The design-build contract signed with EDF comprised engineering studies, procurement, transport and the commissioning of the plant. It now provides power for the French half of the island. Challenge One of the biggest challenges in the project came in the logistics required to transport the engines, each weighing 175 tonnes. Equipment could not be moved directly using cranes due to the island’s topology. Specific logistical organisation was put in place for handling operations. Bouygues Energies & Services’ experience in managing projects in isolated areas (particularly in the “energy boulevard” project in the Republic of the Congo, the Gabon interconnected network, etc.) were key success factors for the project. Innovation The use of 3D design made it possible to coordinate the technical packages in order to prepare for construction and operation with the greatest possible degree of accuracy. The power plant is operated using a SCADA (Supervisory Control And Data Acquisition) system, an ultra-modern remote-control and remote-monitoring system. A training programme for EDF and for local companies involved was organised, to help them operate the power station using the latest technology. Responsible « We wanted an accident-free construction site », stated Gino Gauthier, Executive Vice President at Bouygues Energies & Services, adding that there was be a supervisor at the construction site with the sole role of ensuring compliance with safety regulations (wearing hard hats, regulation footwear and clothing, etc.). Failure to adhere to safety regulations at the construction site was grounds for dismissal. Environment The construction site was not only exemplary with regard to safety. In addition, it was awarded the Ecosite label, rewarding the commitment of all those involved in the project to respecting the environment. Ecosite is awarded by Bouygues Construction’s sustainable development department on the basis of an audit analysing specific criteria and defining the environmental standards to be met, such as managing waste and hazardous materials, reducing noise pollution, air quality, respect for biodiversity, reducing energy consumption, etc. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
