logo

The Tanger Med port complex

Sector: Automotive • Location: Morocco

Source: Bouygues

Project
Closed

Context Business and trade are booming in Tangiers,. As Morocco’s second most important industrial centre after Casablanca, Tangiers’s industrial activity is both dynamic and diversified across textile, chemical, mechanical, metallurgical and naval sectors, among others. As a meeting-point for two cultures and two economies, the city now operates a port that is worthy of its trading ambitions.

Project Information FAQ

Project Information

4 Q
The project “The Tanger Med port complex” is an infrastructure initiative in the Automotive sector, located in Morocco. Taiyo aggregates data on it from Bouygues.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Context Business and trade are booming in Tangiers,. As Morocco’s second most important industrial centre after Casablanca, Tangiers’s industrial activity is both dynamic and diversified across textile, chemical, mechanical, metallurgical and naval sectors, among others. As a meeting-point for two cultures and two economies, the city now operates a port that is worthy of its trading ambitions. Challenge In 2015, the Tanger Med port complex became one of the leading port hubs in the Mediterranean and in Africa. Between the original site opened in 2007 and its extension in 2015, its total capacity now stands at 8 million containers, 7 million vehicles, 700,000 trucks and 10 million tonnes of oil… practically double the capacity of the original port of Tangiers! Project Despite the economic crisis, it was decided in 2009 to extend the port on the west side of Tangier Med I. The Tangier Mediterranean Special Agency (TMSA) entrusted the consortium of Bouygues Travaux Public (lead company), Bymaro, Saipem, Besix and Somagec with the port extension, which was to be known as Tanger-Med II. Tanger-Med I was a victim of its own success; the area already included two breakwater barriers, a container port and a ferry port. It was therefore important that the port have a place in the new infrastructure that would be the Tanger-Med II port. The “new” port incorporates two deepwater container terminals that provide an additional capacity of 5.2 million TEUs (Twenty-foot Equivalent Units). Innovation Built in deep water on an artificial breakwater consisting of 23 precast reinforced concrete caissons for the Tanger Med I project and 40 caissons 35 metres high (capable of withstanding a once-in-a-century swell!) for the Tanger Med II project, the site boasts numerous technical innovations. For instance, each caisson is fitted with a polarised-iron band mounted a few centimetres deep which makes it possible to repel ions that cause oxidation and corrosion, helping to make the site more sustainable.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data