The Tunnel Prenj
Concept reviewed · Bosnia and Herzegovina
Source: European Bank for Reconstruction and Development (EBRD)
The Project will finance the construction to full motorway standard of a 35 km-long section of Corridor Vc. It consists of three functionally dependent sub-sections: (i) a 12 km-long section from Ovcari to Tunnel Prenj, including interchanges Ovcari and Konjic; (ii) 10 km-long Tunnel Prenj dual tube with 2 lanes per direction, and all related ventilation, safety, monitoring and management equipmen
- Status
- Prospective
- Sector
- Road, Government, Residential, Tunnel, Commercial
- Location
- Bosnia and Herzegovina
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about The Tunnel Prenj
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | concept reviewed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project will finance the construction to full motorway standard of a 35 km-long section of Corridor Vc. It consists of three functionally dependent sub-sections: (i) a 12 km-long section from Ovcari to Tunnel Prenj, including interchanges Ovcari and Konjic; (ii) 10 km-long Tunnel Prenj dual tube with 2 lanes per direction, and all related ventilation, safety, monitoring and management equipment and installations; and (iii) a 13 km-long section between Tunnel Prenj and Mostar North (not including the interchange). The client is the Motorways of the Federation of Bosnia and Herzegovina (the “Client”), a limited liability company fully owned by the Federation of Bosnia and Herzegovina (“FBH”) Government. The Client is responsible for the development, operation and maintenance of motorways and expressways in the FBH. The Project is part of the Corridor Vc which is part of the Western Balkans Core Network and has been established as an extension of the Trans-European Transport Networks (TEN-T) in the Western Balkans. Corridor Vc is the key motorway which connects BiH to EU markets via Budapest in the north and the Port of Ploce on the Adriatic coast in Croatia in the south. Following documents are available in Bosnian and English languages: Download package in English Download package in Bosnian And EBRD Resident Office 15th Floor, Tower B Unitic Towers Fra Andela Zvizdovica 1 71000 Sarajevo, Bosnia and Herzegovina. Tel: + 387 33 257 900 Environmental and social enquiries and General enquiries Merima Karabegović, Sarajevo office, e-mail: k.merima@jpautoceste.ba Ivan Rebac, Mostar office, e-mail: r.ivan@jpautoceste.ba |
Original sector | Transport |
Location
Country | Bosnia and Herzegovina |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Residential, Tunnel, Commercial |
Article published date | 2026-09-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
