logo

Therma South Coal-fired Power Project

Sector: Commercial • Location: Philippines

Source: World Bank Group

Project
Active

Therma South Inc., a wholly-owned subsidiary of Aboitiz Power Corporation, is the project company responsible for the development of a 300 MW circulating fluidized-bed coal-fired power plant in Barangay Binugao, Toril District, Davao City and Barangay Inawayan, Sta. Cruz, Davao del Sur.

The power project was initiated by Therma South in response to the urgent need to build the plant in order to a

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Therma South Coal-fired Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Therma South Coal-fired Power Project” is an infrastructure initiative in the Commercial sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Therma South Inc., a wholly-owned subsidiary of Aboitiz Power Corporation, is the project company responsible for the development of a 300 MW circulating fluidized-bed coal-fired power plant in Barangay Binugao, Toril District, Davao City and Barangay Inawayan, Sta. Cruz, Davao del Sur. The power project was initiated by Therma South in response to the urgent need to build the plant in order to augment power supply in Davao and the entire Mindanao. The project received endorsement from local government units in Davao City and the municipality of Sta. Cruz in Davao del Sur. The total cost of the project was estimated at $720 million with 75 percent funding from nonrecourse financing while the remaining 25 percent to be funded by equity. The project achieved financial close in October 2013 after signing a USD 557 million loan agreement with a consortium of lenders and banks for the construction and operation of the power plant. The two 150-MW units are slated to start commercial operations in the first half of 2015.

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project