Thermoacoustic- based residential mCHP system
Ended · Israel
Source: EU Funding & Tenders Portal
The eTAG (embedded ThermoAcoustic Generator) includes a novel electricity- generating thermoacoustic engine, embedded inside an existing residential boiler, to form a renewable and economic micro Combined Heat and Power (mCHP) system, without any hot moving parts. The proposed synergetic approach results with a sustainable system, taking full advantage of alternative fuels value to produce regulat
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Manufacturing (Industrial), Residential, Government
- Location
- Israel
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Thermoacoustic- based residential mCHP system
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The eTAG (embedded ThermoAcoustic Generator) includes a novel electricity- generating thermoacoustic engine, embedded inside an existing residential boiler, to form a renewable and economic micro Combined Heat and Power (mCHP) system, without any hot moving parts. The proposed synergetic approach results with a sustainable system, taking full advantage of alternative fuels value to produce regulated electrical power as well as domestic heating, at overall energy efficiency above 90%. To enable a cost effective application, the embedded electricity generating unit must be highly reliable and maintenance free, thus a thermoacoustically based solution is expected to be the ideal solution. Qnergy has recently demonstrated 1 kW solar thermoacoustic application. However, the optimal configuration and combined system spec must be refined for best market acceptance, according to consumer’s needs and budget limitations. In common situations, a typical user will experience an ROI of less than two years; though specific government policies may lead to different optimal power capacities, as net metering allows using an oversized alternator and feedback the grid in excessive electricity. Thus our planned feasibility assessment will include a thorough business plan, focusing on market needs, time to market, and identifying the main customers and competitors; resulting in a measurable product specification and detailed risk management plan. Additionally, the key factors affecting overall system performance will be identified according to the thermo-acoustic-electrical simulation and the detailed design model. Moreover, a full freedom to operate IP survey will be performed, while the product cost, manufacturing technologies and its limitations will be covered. During phase 1 broad market understanding would be sought, allowing to better select the content and schedule of the following phase 2, focusing mostly on particular techniques for lowering the $/W value of the full system. |
Location
Country | Israel |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Manufacturing (Industrial), Residential, Government |
Article published date | 2026-01-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
