Theun Hinboun Hydro Power Plant I

Sector: Hydro • Location: Lao PDR, Thailand

Source: World Bank Group

Project
Active

The 210-MW (2x105-MW), $315.5-MW Nam Hinboun Hydro Power Plant I is being developed through a 30-year BOT by Theun-Hinboun Power Co. Ltd. which comprises Electricite du Laos (60%), GMS Power of Thailand (20%) (formerly MDX Power), and Nordic Hydropower (20%)--a consortium Statkraft, Vattenfall, and Elkraft, Nordic Power Invest AB (a wholly owned subsidiary of Vatenfall). The project, which represe

Project Information FAQ

Project Information

4 Q
The project “Theun Hinboun Hydro Power Plant I” is an infrastructure initiative in the Hydro sector, located in Lao PDR, Thailand. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 210-MW (2x105-MW), $315.5-MW Nam Hinboun Hydro Power Plant I is being developed through a 30-year BOT by Theun-Hinboun Power Co. Ltd. which comprises Electricite du Laos (60%), GMS Power of Thailand (20%) (formerly MDX Power), and Nordic Hydropower (20%)--a consortium Statkraft, Vattenfall, and Elkraft, Nordic Power Invest AB (a wholly owned subsidiary of Vatenfall). The project, which represents the first IPP in Laos, is under construction may be the first of a number of privately-funded hydro power project on the Nam Theun River. Nordic Hydro Power will construct, operate and maintain the project. A 25-year PPA was signed with the Electricity Generating Authority of Thailand (EGAT) to export power output from the project. The PPA specifies that half the payments are in dollars and the other half in Thai baht and calls for 3% annual increases in tariffs. The project also includes the development of a 138-km transmission line to Thakhek on the Thailand-Laos border. Electricite du Laos is receiving financing from the Asian Development Bank and is providing a small grant toward project development. Financial closure took place in October 1996 and the project was expected to become operational during 1998. The project was refinanced in April 2002, the financial adviser was BNP Paribas who replaced Citibank, the adviser on the first loan. It includes a Bt3bn 10-year loan arranged by Bangkok Bank with a fixed interest rate of 8% for the first 3 years and then a 125bp over the minimum lending rate. Participants were Bank of Ayudhya, Bank Thai, Ekachart Finance, Siam City Bank, Siam Commercial Bank and Thai Military Bank. Ex-Im Bank of Thailand also contributed a US$30m loan. In addition to the original plant, the expansion project would involve a 220MW plant, which is an extension to the existing plant, and a second plant comprising two 30MW units served by a new dam on the Nam Gnouang, with expepected operational schedule of March 2012. In October 2008, the expansion project reached closed finance, securing US dollar and Thai Baht syndicated loans totaling up to US$595 million at a signing ceremony held in Bangkok.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data