Thief River Falls Lead Service Line Replacement
Sector: Water Supply and Storage • Location: Thief River Falls, Minnesota, United States of America
Source: Dodge
The Work shall be completed under five Contracts and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components: Contract No. 1 Lead Service Line Area 1: Work generally includes the installation of 16 new residential water service lines including curb stops, curb stop boxes, PE piping, shutoff ball valve
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Commercial, Residential
- Location
- Thief River Falls, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Thief River Falls Lead Service Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work shall be completed under five Contracts and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components: Contract No. 1 Lead Service Line Area 1: Work generally includes the installation of 16 new residential water service lines including curb stops, curb stop boxes, PE piping, shutoff ball valves, and connections to the existing residential water meters; 1 new utility water service line inc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Thief River Falls |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
