logo

Thika IPP

Sector: Oil and Gas • Location: Kenya

Source: International Finance Corporation (IFC)

Project
Completed

The project consists of the development, design, construction and operation of a Greenfield 87 MW Heavy Fuel Oil (“HFO”) diesel power plant on a 20 years Build-Own-Operate (“BOO”) basis in Thika, about 35 km from Nairobi, Kenya (the “Project”). The Project will have a 20 year Power Purchase Agreement (“PPA”) with Kenya Power and Lighting Company (“KPLC”), the national transmission and distribution

Project Information FAQ

Project Information

4 Q
The project “Thika IPP” is an infrastructure initiative in the Oil and Gas sector, located in Kenya. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the development, design, construction and operation of a Greenfield 87 MW Heavy Fuel Oil (“HFO”) diesel power plant on a 20 years Build-Own-Operate (“BOO”) basis in Thika, about 35 km from Nairobi, Kenya (the “Project”). The Project will have a 20 year Power Purchase Agreement (“PPA”) with Kenya Power and Lighting Company (“KPLC”), the national transmission and distribution company. The project’s prime movers will be medium-speed reciprocating diesel engines, using HFO as primary fuel with supplemental firing of light fuel oil (LFO), and a steam turbine bottoming cycle. The plant configuration will consist of five 18V48/60 MAN diesel generating units with one MAN Model Marc2 C01 steam turbine driven generator (approximately 7 MW). The steam turbine is powered by steam produced using the waste heat of the five reciprocating engines. The net output of the project will be approximately 87 MW. The heat rate of the Project is improved as engine exhaust energy is used to generate steam for the steam turbine.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data