Thika IPP
Sector: Oil and Gas • Location: Kenya
Source: International Finance Corporation (IFC)
The project consists of the development, design, construction and operation of a Greenfield 87 MW Heavy Fuel Oil (“HFO”) diesel power plant on a 20 years Build-Own-Operate (“BOO”) basis in Thika, about 35 km from Nairobi, Kenya (the “Project”). The Project will have a 20 year Power Purchase Agreement (“PPA”) with Kenya Power and Lighting Company (“KPLC”), the national transmission and distribution
- Status
- Closed
- Sector
- Oil and Gas, Waste Processing and Treatment, Manufacturing (Industrial), Wind, Water Supply and Storage, Hydro, Geothermal, Government, Power Generation (CCGT), Road
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Thika IPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the development, design, construction and operation of a Greenfield 87 MW Heavy Fuel Oil (“HFO”) diesel power plant on a 20 years Build-Own-Operate (“BOO”) basis in Thika, about 35 km from Nairobi, Kenya (the “Project”). The Project will have a 20 year Power Purchase Agreement (“PPA”) with Kenya Power and Lighting Company (“KPLC”), the national transmission and distribution company. The project’s prime movers will be medium-speed reciprocating diesel engines, using HFO as primary fuel with supplemental firing of light fuel oil (LFO), and a steam turbine bottoming cycle. The plant configuration will consist of five 18V48/60 MAN diesel generating units with one MAN Model Marc2 C01 steam turbine driven generator (approximately 7 MW). The steam turbine is powered by steam produced using the waste heat of the five reciprocating engines. The net output of the project will be approximately 87 MW. The heat rate of the Project is improved as engine exhaust energy is used to generate steam for the steam turbine. |
Original sector | AC - Heavy Fuel Oil - Thermal Power Generation |
Location
Country | Kenya |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Waste Processing and Treatment, Manufacturing (Industrial), Wind, Water Supply and Storage, Hydro, Geothermal, Government, Power Generation (CCGT), Road |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
