Third Bosphorus Bridge and Northern Maramara Highway Project

Sector: Mass Transit • Location: Turkey

Source: World Bank Group

Project
Active

In 2012, Turkey’s ministry of transportation awarded the Third Bosphorus Bridge and Northern Maramara Highway Project to a joint venture of IC Holding (67%) and Astaldi (33%) on a BOT basis for 10 years, 2 months, and 20 days. The project comprised of building a 1,875-metre tolled suspension bridge with a 1,275-metre span between the villages of Poyrazköy and Garipçe, which would automobiles and

Project Information FAQ

Project Information

4 Q
The project “Third Bosphorus Bridge and Northern Maramara Highway Project” is an infrastructure initiative in the Mass Transit sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2012, Turkey’s ministry of transportation awarded the Third Bosphorus Bridge and Northern Maramara Highway Project to a joint venture of IC Holding (67%) and Astaldi (33%) on a BOT basis for 10 years, 2 months, and 20 days. The project comprised of building a 1,875-metre tolled suspension bridge with a 1,275-metre span between the villages of Poyrazköy and Garipçe, which would automobiles and railway traffic on separate levels. The project also included 60 km dual four lane Northern Marmara motorway between Odayeri and Pasakoy. Additionally, the project included construction of 55km of connection roads, 19 motorway junctions, 67 viaducts, and seven tunnels and a road/rail stay cable stiffened suspension bridge across the Bosphorus. The IC Ictas-Astaldi consortium bid the shortest shortest concession period for the project, 10 years, two months and 20 days including 36 months for construction. The sponsors took construction risk but obtained commitments from the government for availability payments - there is a minimum guarantee on revenue of $150 million per year. The second placed bidders, Cengiz/Kolin/Limak/Makyol/Kalyon, bid 14 years, nine months and four days, while the third prequalified team of Salini and Gülermak were disqualified on the grounds that their bid was not compliant. The total cost of the project was estimated at USD 2.9 billion. The project reached financial closing in May 2014 with a debt equity ratio of 80:20. Lenders for the nine year USD 2.3 billion loan were Isbank, Yapi Kredi, Vakifbank, Garanti, Halkbank, Ziraat Bank and Garanti Bank International NV. Construction of the bridge and highway began in May 2013 and is expected to become operational by the end of 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data