Third crossing over the Cataraqui River
The status, timeline and source of this project. A free account opens every field.
Source: InfraPPPWorld
The bridge, which will rise between 12 and 14 meters above the river surface, will consist of two-lane, running 1.2 kilometers from John Counter Boulevard to Gore Road, and it will include a multi-use pathway to accommodate bicycles and pedestrians.It will be the third crossing over the Cataraqui River, which forms the lower portion of the Rideau Canal and drains into Lake Ontario at Kingston, Ont
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Third crossing over the Cataraqui River
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The bridge, which will rise between 12 and 14 meters above the river surface, will consist of two-lane, running 1.2 kilometers from John Counter Boulevard to Gore Road, and it will include a multi-use pathway to accommodate bicycles and pedestrians.It will be the third crossing over the Cataraqui River, which forms the lower portion of the Rideau Canal and drains into Lake Ontario at Kingston, Ontario. |
Original sector | Transport |
Budget |
Location
Country | Canada |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
