THIRD HIGHWAY PROJEC
Sector: Road • Location: Mauritania
Source: World Bank Group
The aim of the Third Highway Project for Mauritania is to consolidate and expand the maintenance effort started under the Second Highway Project; implementation of this program will lead to a reduction in vehicle operating costs on the network, and will also extend its seasonal use. The economic return on the maintenance item is estimated at about 36percent over the six-year expected life of the c
- Status
- Closed
- Sector
- Road, Government
- Location
- Mauritania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about THIRD HIGHWAY PROJEC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The aim of the Third Highway Project for Mauritania is to consolidate and expand the maintenance effort started under the Second Highway Project; implementation of this program will lead to a reduction in vehicle operating costs on the network, and will also extend its seasonal use. The economic return on the maintenance item is estimated at about 36percent over the six-year expected life of the capital investment. The betterment program will ensure all-weather transport on two roads serving the most agriculturally productive and densely populated areas of the country. This project item yields an economic return of about 35percent on the Boghe-Kaedi-Kiffa road in the south, and of about 16percent on the Akjoujt-Atar-Choum road in the north. The pre-investment studies concern improvement of the most heavily trafficked unpaved road in the country. The project will consist of the following: (a) technical assistance to the Ministry of Equipment; (b) purchase of highway equipment for maintenance and betterment works; (c) continuation of a betterment program on about 365 km of roads; and (d) feasibility study and detailed engineering for construction of the Rosso-Boghe road (200 km), the most heavily trafficked unpaved road in the country. |
Original sector | Transportation |
Location
Country | Mauritania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
