Third Lane at Grand Bassin
Sector: Bridge • Location: Mauritius
Source: Road Development Authority (RDA), Mauritius (Projects)
The site of the works is located along P.J.G.G.N (Grand Bassin) Road (B88) from Gouly to Bois Cheri over a length of 2.0 km. The average width of the existing road (B88) varies between 6.0 and 6.5 meters. The existing two bridges along the road have also been widened and upgradedClick here to view the Project Brief.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The site of the works is located along P.J.G.G.N (Grand Bassin) Road (B88) from Gouly to Bois Cheri over a length of 2.0 km. The average width of the existing road (B88) varies between 6.0 and 6.5 meters. The existing two bridges along the road have also been widened and upgradedClick here to view the Project Brief. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
