logo
ProjectStart

Third Line West & Structure 24-P Reconstruction

Start · Ontario · Last reported Mar 2020

Source: Dodge USA

For the reconstruction of Third Line West and replacement of Structure 24-P at Carroll Creek (former Township of Pilkington), in the Township of Centre Wellington. The Approximate Quantities of the Main Items are as Follows: BRIDGE REMOVAL AND DISPOSAL - L.S. NEW 15.0m SPAN INTEGRAL ABUTMENT BRIDGE WITH PRESTRESS BOX BEAMS EARTH EXCAVATION - 2,650 m3 GRANULAR MATERIALS - 5,650 Tonnes STORM SEWERS

Status
Under Construction
Sector
Commercial, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Government, Manufacturing (Industrial)
Location
Elora, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Third Line West & Structure 24-P Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Third Line West & Structure 24-P Reconstruction” is an infrastructure initiative in the Commercial sector, located in Elora, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For the reconstruction of Third Line West and replacement of Structure 24-P at Carroll Creek (former Township of Pilkington), in the Township of Centre Wellington. The Approximate Quantities of the Main Items are as Follows: BRIDGE REMOVAL AND DISPOSAL - L.S. NEW 15.0m SPAN INTEGRAL ABUTMENT BRIDGE WITH PRESTRESS BOX BEAMS EARTH EXCAVATION - 2,650 m3 GRANULAR MATERIALS - 5,650 Tonnes STORM SEWERS (ALL SIZES) - 364.5 m MAINTENANCE HOLES & CATCHBASINS - 12 units CONCRETE CURB & GUTTER - 550 m H...

Procurement method

Location

Country

Canada

State

Ontario

City

Elora

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Government, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project