Third Narmada Bridge
Sector: Bridge • Location: India
Source: Larsen & Toubro
Built in a record time of just 30 months, the bridge is 1.34 km long, stayed cable and extradosed system with Dyna-Link Anchor box stay cable system. The construction had to face multiple challenges of variations in the water level of the Narmada, floods of 2014 and 2016 and the danger of working next to a live highway.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Built in a record time of just 30 months, the bridge is 1.34 km long, stayed cable and extradosed system with Dyna-Link Anchor box stay cable system. The construction had to face multiple challenges of variations in the water level of the Narmada, floods of 2014 and 2016 and the danger of working next to a live highway. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
