logo

Third Narmada Bridge

Sector: Bridge • Location: India

Source: Larsen & Toubro

Project
Completed

Built in a record time of just 30 months, the bridge is 1.34 km long, stayed cable and extradosed system with Dyna-Link Anchor box stay cable system. The construction had to face multiple challenges of variations in the water level of the Narmada, floods of 2014 and 2016 and the danger of working next to a live highway.

Project Information FAQ

Project Information

4 Q
The project “Third Narmada Bridge” is an infrastructure initiative in the Bridge sector, located in India. Taiyo aggregates data on it from Larsen & Toubro.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Built in a record time of just 30 months, the bridge is 1.34 km long, stayed cable and extradosed system with Dyna-Link Anchor box stay cable system. The construction had to face multiple challenges of variations in the water level of the Narmada, floods of 2014 and 2016 and the danger of working next to a live highway.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data