logo

Third National Railway Project

Sector: Mass Transit • Location: China

Source: World Bank Group

Project
Closed

The Project aims to assist China in expanding the capacity of its railway system to meet the growing demand for transport of people and goods between Guizhou and Yunnan provinces. The two basic components of the project includes: (1) the electrified railway line between the city of Liupanshui in Guizhou Province and the city of Zhanyi in Yunnan Province will be upgraded to increase its capacity an

Project Information FAQ

Project Information

5 Q
The project “Third National Railway Project” is an infrastructure initiative in the Mass Transit sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project aims to assist China in expanding the capacity of its railway system to meet the growing demand for transport of people and goods between Guizhou and Yunnan provinces. The two basic components of the project includes: (1) the electrified railway line between the city of Liupanshui in Guizhou Province and the city of Zhanyi in Yunnan Province will be upgraded to increase its capacity and allow for higher operating speeds of trains, including realignment of the existing track as needed and construction of a second track throughout, to design standards that will allow operation of double-stack container trains. Persons displaced in connection with carrying out the above will be resettled. The new line will broadly follow the existing corridor but, to enable the running speed to be increased, the alignment will be straightened and the route length will be reduced; and (2) the capacity of the Ministry of Railways on railway planning, management and technology will be strengthened, through studies, technical assistance and training. Proposed studies and training include: (a) technical study on the reliability of current collection and extra-high catenary design for high-speed rail lines, (b) research and study on rail grinding methods for improving operating efficiency, and (c) training.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data