logo

THIRD POWER PROJECT

Sector: Power Generation (CCGT) • Location: Egypt, Arab Republic of

Source: World Bank Group

Project
Closed

The objective of the Third Power Project is to help meet the electricity load forecast through 1986. The project will consist of three different components: (i) an extension of the old Aswan hydropower station; (ii) the completion of the Shoubrah El Kheima Thermal Power Station, north of Cairo; and (iii) the rehabilitation and extension of distribution facilities in urban, suburban and rural areas

Project Information FAQ

Project Information

5 Q
The project “THIRD POWER PROJECT” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Third Power Project is to help meet the electricity load forecast through 1986. The project will consist of three different components: (i) an extension of the old Aswan hydropower station; (ii) the completion of the Shoubrah El Kheima Thermal Power Station, north of Cairo; and (iii) the rehabilitation and extension of distribution facilities in urban, suburban and rural areas outside Cairo and Alexandria. Specifically the project will comprise: (i) four 67.5 MW Kaplan turbines; (ii) a 300 MW steam electric generating unit; and (iii) about 7,000kms of 11-kv and 380/220 volts lines and 250 MW of distribution transformer capacity. The Qattara Hydropower and Renewable Energy Resources Project Authority will be responsible for the construction of the hydropower component, the Egyptian Electricity Authority for the thermal power unit and the Rural Electricification Authority for the regional electrification component. The project will meet primarily industrial needs and also supply growing urban and rural demands. Physical risks of the project are those related to difficult underwater excavations for the hydropower component. Also, there are certain risks related to EEA's financial performance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data