logo
ProjectClosed

Third Rural Electrification

Closed · Bangladesh

Source: World Bank Group

The project will consist of the supply and installation of necessary equipment, material, and the associated engineering services for the implementation of phase IV A of the rural electrification program. The project's main objectives are to substitute power at least cost for imported petroleum products and to strengthen REB and PBSs' performance by : a) expanding distribution networks to unserve

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Automotive, Oil and Gas, Commercial, Government, Residential, Manufacturing (Industrial)
Location
Bangladesh
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Third Rural Electrification

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Third Rural Electrification” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will consist of the supply and installation of necessary equipment, material, and the associated engineering services for the implementation of phase IV A of the rural electrification program. The project's main objectives are to substitute power at least cost for imported petroleum products and to strengthen REB and PBSs' performance by : a) expanding distribution networks to unserved areas; b) rehabilitating exisitng systems; c) reducing system losses; and d) improving PBSs' financial viability and institutional performance through modification of accounting practices etc. By completion, the project will extend public electricity supply to about 122,000 domestic, 20,000 commercial, and 2,900 industrial consumers, as well as to 5,600 irrigation pumps. The project's eight components are the following : 1) construction of 6,035 km primary lines ( 3 phase and single phase ), and 3,015 km of secondary lines; 2) construction of 18 substations; 3) service materials ( service connections, meters, LT capacitors ) for consumer connections; 4) support commodities ( vehicles, motorcycles, tools, boats etc ); 5) rehabilitation of 850 km of existing low voltage lines and distribution substations; 6) general plant for PBSs ( local transport, office and residential buildings etc ); 7) infrastructure and support facilities for REB ( headquarter offices, training center etc ); and finally 8) consulting services to assist REB and the PBSs in project execution and management.

Original sector

Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Bangladesh

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Automotive, Oil and Gas, Commercial, Government, Residential, Manufacturing (Industrial)

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project