logo

Third Rural Electrification

Sector: Water Supply and Storage • Location: Bangladesh

Source: World Bank Group

Project
Closed

The project will consist of the supply and installation of necessary equipment, material, and the associated engineering services for the implementation of phase IV A of the rural electrification program. The project's main objectives are to substitute power at least cost for imported petroleum products and to strengthen REB and PBSs' performance by : a) expanding distribution networks to unserve

Project Information FAQ

Project Information

5 Q
The project “Third Rural Electrification” is an infrastructure initiative in the Water Supply and Storage sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will consist of the supply and installation of necessary equipment, material, and the associated engineering services for the implementation of phase IV A of the rural electrification program. The project's main objectives are to substitute power at least cost for imported petroleum products and to strengthen REB and PBSs' performance by : a) expanding distribution networks to unserved areas; b) rehabilitating exisitng systems; c) reducing system losses; and d) improving PBSs' financial viability and institutional performance through modification of accounting practices etc. By completion, the project will extend public electricity supply to about 122,000 domestic, 20,000 commercial, and 2,900 industrial consumers, as well as to 5,600 irrigation pumps. The project's eight components are the following : 1) construction of 6,035 km primary lines ( 3 phase and single phase ), and 3,015 km of secondary lines; 2) construction of 18 substations; 3) service materials ( service connections, meters, LT capacitors ) for consumer connections; 4) support commodities ( vehicles, motorcycles, tools, boats etc ); 5) rehabilitation of 850 km of existing low voltage lines and distribution substations; 6) general plant for PBSs ( local transport, office and residential buildings etc ); 7) infrastructure and support facilities for REB ( headquarter offices, training center etc ); and finally 8) consulting services to assist REB and the PBSs in project execution and management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data