Third Rural Electrification
Closed · Bangladesh
Source: World Bank Group
The project will consist of the supply and installation of necessary equipment, material, and the associated engineering services for the implementation of phase IV A of the rural electrification program. The project's main objectives are to substitute power at least cost for imported petroleum products and to strengthen REB and PBSs' performance by : a) expanding distribution networks to unserve
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Automotive, Oil and Gas, Commercial, Government, Residential, Manufacturing (Industrial)
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Third Rural Electrification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will consist of the supply and installation of necessary equipment, material, and the associated engineering services for the implementation of phase IV A of the rural electrification program. The project's main objectives are to substitute power at least cost for imported petroleum products and to strengthen REB and PBSs' performance by : a) expanding distribution networks to unserved areas; b) rehabilitating exisitng systems; c) reducing system losses; and d) improving PBSs' financial viability and institutional performance through modification of accounting practices etc. By completion, the project will extend public electricity supply to about 122,000 domestic, 20,000 commercial, and 2,900 industrial consumers, as well as to 5,600 irrigation pumps. The project's eight components are the following : 1) construction of 6,035 km primary lines ( 3 phase and single phase ), and 3,015 km of secondary lines; 2) construction of 18 substations; 3) service materials ( service connections, meters, LT capacitors ) for consumer connections; 4) support commodities ( vehicles, motorcycles, tools, boats etc ); 5) rehabilitation of 850 km of existing low voltage lines and distribution substations; 6) general plant for PBSs ( local transport, office and residential buildings etc ); 7) infrastructure and support facilities for REB ( headquarter offices, training center etc ); and finally 8) consulting services to assist REB and the PBSs in project execution and management. |
Original sector | Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Bangladesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Automotive, Oil and Gas, Commercial, Government, Residential, Manufacturing (Industrial) |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Rooppur Nuclear Power Plant Ishwardi
- Meghnaghat Combined Cycle GasFired Power Plant Meghnaghat
- Bangladesh Bhola IPP
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant
- Chittagong Container Terminal (first contract)
- Development of Water Distribution and Supply Facilities at Purbachal New Town
- SEA-ME-WE5 Bangladesh
