Third Space for Creatives / Atelier d'Architecture Gardera-Pastre
Closed · France · Last reported Nov 2023
Source: ArchDaily
The first floor features spaces reminiscent of containers. Volumes are more opaque, and light is controlled to ensure thermal comfort for users. Several functions have been combined in a single building: exhibitions, offices, business incubators, Fab lab, shared spaces, workshops, etc. The agency worked in an interior space that had already been de-finished, preserving the metal framework. Blocks
- Status
- Closed
- Sector
- Geothermal, Metal, Manufacturing (Industrial), Residential, Cement, Commercial
- Location
- France
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Third Space for Creatives / Atelier d'Architecture Gardera-Pastre
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The first floor features spaces reminiscent of containers. Volumes are more opaque, and light is controlled to ensure thermal comfort for users. Several functions have been combined in a single building: exhibitions, offices, business incubators, Fab lab, shared spaces, workshops, etc. The agency worked in an interior space that had already been de-finished, preserving the metal framework. Blocks were inserted inside the building, and the organization of the spaces was designed in trays.The materials used in the renovation, such as glass and metal, also reflect this heritage. The floors are new, with industrial concrete slabs. The renovation of the industrial building is rooted in its industrial history and preserves its codes.As soon as you enter the hall, the volumes and their functionalities are revealed. The ground-floor space is luminous, even when closed, thanks to polycarbonate panels and double sliding doors. The material of these panels also ensures user comfort by preheating the air to create a temperate space. The offices and workshops are partitioned by wood in natural shades, bringing warmth to the space and guaranteeing acoustic performance for users.Text description provided by the architects.Halles 1&2, the last site to be redeveloped within the Ile deNantesindustrial complex, is part of a district already defined by the site plan created by architect Franklin Azzi. Emblematic of the building's industrial history, the metal framework, a reminder of its original function, has been preserved.Thanks to the sliding doors, the façade opens over 20 meters and the public space extends into Halles 1&2. The refurbishment created an urban village in direct communication with the forecourt of the Ecole des Beaux-Arts and brought the city inside the building into a district already defined by the plan. |
Location
Country | France |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Geothermal, Metal, Manufacturing (Industrial), Residential, Cement, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
