Thomas Avenue Paving and Drainage Reconstruction Phase 2
Sector: Water Supply and Storage • Location: Pasadena, Texas, United States of America
Source: Dodge USA
Reconstruction of Thomas Ave from Bearle St to Alastair Ave. Scope includes to remove existing street and install new concrete paving, curb and gutter sections with suitable size storm water inlets at appropriate locations to drain the street
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Reconstruction of Thomas Ave from Bearle St to Alastair Ave. Scope includes to remove existing street and install new concrete paving, curb and gutter sections with suitable size storm water inlets at appropriate locations to drain the street |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
