Thomas Betts Peele Road Site Offsite Utilities
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project consists of the extension of approximately 7,766 LF of 12" and 637 LF of 6" waterline and all associated appurtenances and hydrants. In addition, the project consists of approximately 1,367 LF of 12" gravity sewer main and 5 manholes.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Rocky Mount, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Thomas Betts Peele Road Site Offsite Utilities
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the extension of approximately 7,766 LF of 12" and 637 LF of 6" waterline and all associated appurtenances and hydrants. In addition, the project consists of approximately 1,367 LF of 12" gravity sewer main and 5 manholes. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Rocky Mount |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
