logo

Thomas Street Reconstruction

Sector: Cement • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Fairview Avenue to approximately 550 feet east of Fairview Avenue Length: Approximately 550 feet District: 3 Community: Hemet

The County of Riverside Transportation Department is proposing to reconstruct approximately 550 feet of Thomas Street from Fairview Avenue to approximately 550 feet east of Fairview Avenue. Thomas Street is classified as a local road in the County of Riverside’s Ge

Project Information FAQ

Project Information

4 Q
The project “Thomas Street Reconstruction” is an infrastructure initiative in the Cement sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Fairview Avenue to approximately 550 feet east of Fairview Avenue Length: Approximately 550 feet District: 3 Community: Hemet The County of Riverside Transportation Department is proposing to reconstruct approximately 550 feet of Thomas Street from Fairview Avenue to approximately 550 feet east of Fairview Avenue. Thomas Street is classified as a local road in the County of Riverside’s General Plan. Thomas Street is currently 32 feet wide with curb/gutter on each side of the roadway. The proposed project will include removing the roadway and placing back Hot Mix Asphalt (HMA) over aggregate base. The proposed project will also include: Reconstruction of concrete spandrel and cross gutter Utility adjustments Striping of roadway Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will remain within the existing footprint of the roadway and will not raise the existing roadway profile.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data