Thomaston Downtown Multi-Use Facility
Sector: Water Supply and Storage • Location: Thomaston, Georgia, United States of America
Source: Dodge
- Work To Be Done: The Work to be completed for the Downtown Multi-Use Facility is described briefly as follows: The project generally includes the construction of a pavilion with an adjacent restroom facility, along with a parking area, curb and gutter, concrete sidewalks, water and sanitary sewer systems, storm sewer, grading, electrical work, and landscaping. Additionally, the scope includes r
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Power Generation (CCGT), Government, Waste Processing and Treatment, Cement, Car parking, Automotive, Commercial
- Location
- Thomaston, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Thomaston Downtown Multi-Use Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2. Work To Be Done: The Work to be completed for the Downtown Multi-Use Facility is described briefly as follows: The project generally includes the construction of a pavilion with an adjacent restroom facility, along with a parking area, curb and gutter, concrete sidewalks, water and sanitary sewer systems, storm sewer, grading, electrical work, and landscaping. Additionally, the scope includes resurfacing an adjacent city-owned road. The project will involve landscaping, traffic control, er... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Thomaston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Power Generation (CCGT), Government, Waste Processing and Treatment, Cement, Car parking, Automotive, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
