Thompson General Hospital (TGH) - OR Department Humidity Control Phase II
Sector: Hospital • Location: Manitoba, Canada
Source: Infrastructure Canada
The Thompson General Hospital (TGH) - OR Department Humidity Control Phase II project (the Project) consists of an upgrade of the HVAC system to provide adequate operating room (OR) humidity control, in order to reduce downtime. Operations cannot take place when humidity falls outside environmental conditions outlined in healthcare/building code.
- Status
- Prospective
- Sector
- Hospital, Commercial, Government
- Location
- Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Thompson General Hospital (TGH) - OR Department Humidity Control Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Thompson General Hospital (TGH) - OR Department Humidity Control Phase II project (the Project) consists of an upgrade of the HVAC system to provide adequate operating room (OR) humidity control, in order to reduce downtime. Operations cannot take place when humidity falls outside environmental conditions outlined in healthcare/building code. |
Original sector | Ventilation Systems |
Location
Country | Canada |
State | Manitoba |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Hospital, Commercial, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
