Thompson-Nicola Regional District (TNRD) Utility Systems Master Plan
Sector: Waste Processing and Treatment • Location: British Columbia, Canada
Source: Infrastructure Canada
The Thompson-Nicola Regional District (TNRD) would like to develop a master plan (MP) for the 11 water and 2 sewer systems owned and operated by the TNRD. Capitalizing on already achieved levels identified in the Asset Management BC (AMBC) Roadmap, the MP will review all systems and develop a systematic, sustainable approach to ensure safe, clean, affordable water and wastewater services. Identifi
- Status
- Closed
- Sector
- Waste Processing and Treatment, Power Transmission, Water Supply and Storage, Power Generation (CCGT), Commercial
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Thompson-Nicola Regional District (TNRD) Utility Systems Master Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Thompson-Nicola Regional District (TNRD) would like to develop a master plan (MP) for the 11 water and 2 sewer systems owned and operated by the TNRD. Capitalizing on already achieved levels identified in the Asset Management BC (AMBC) Roadmap, the MP will review all systems and develop a systematic, sustainable approach to ensure safe, clean, affordable water and wastewater services. Identified priorities will enable the TNRD to prepare financial plans for treatment upgrades and life cycle capital replacements. Building on already achieved asset management plan (Plan) development process, the MP will fill in some of the gaps required for the Plan completion. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Transmission, Water Supply and Storage, Power Generation (CCGT), Commercial |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
