logo

Thorne Water Treatment Plant Capital Improvements

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Replace two low lift pumps since one has failed and the other is failing which places the system at risk. Replace two high lift pump variable frequency drives that have failed to optimize operations and reduce electricity consumption. Replace one heater that has failed and is needed for climate control to protect sensitive equipment. Replace aging clarifier drive which is malfunctioning due to age

Project Information FAQ

Project Information

3 Q
The project “Thorne Water Treatment Plant Capital Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Replace two low lift pumps since one has failed and the other is failing which places the system at risk. Replace two high lift pump variable frequency drives that have failed to optimize operations and reduce electricity consumption. Replace one heater that has failed and is needed for climate control to protect sensitive equipment. Replace aging clarifier drive which is malfunctioning due to age and wear. Replace two chlorine dosing pumps which are beyond their expected life and are required for drinking water disinfection. Add chlorine analyzer and pump to measure clearwell chlorine in order to provide early detection of chlorine residual loss and provide more control of drinking water disinfection. Replace four aging valve and actuators that are critical to the operation of the plant. Replace turbidity analyzer and is required for compliance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data