Thorofare Waterfront Project
Under construction · Maine · Last reported Apr 2025
Source: Maine Beacon
The Thorofare Waterfront Project in North Haven aims to study the impacts of sea level rise on waterfront infrastructure and homes, and to design and construct a technical solution to mitigate risks of future flooding. The project was temporarily halted due to the cancellation of the BRIC funding but has since been confirmed to proceed with previously committed funds.
- Status
- Under Construction
- Sector
- Disaster Relief
- Location
- North Haven, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Maine Beacon
ConstructChat
Ask ConstructChat about Thorofare Waterfront Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Thorofare Waterfront Project in North Haven aims to study the impacts of sea level rise on waterfront infrastructure and homes, and to design and construct a technical solution to mitigate risks of future flooding. The project was temporarily halted due to the cancellation of the BRIC funding but has since been confirmed to proceed with previously committed funds. |
Original sector | Disaster Relief |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | North Haven |
Source
Source | Maine Beacon |
URL |
More Details
Record type | Project |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
