Thousand Oaks - Polybutylene Service & Valve Replacements
Sector: Water Supply and Storage • Location: Thousand Oaks, California, United States of America
Source: Dodge
The Work includes furnishing all labor, materials, tools, equipment, and incidentals as required by the Specifications and Contract Documents to replace 125 existing polybutylene water services with new copper service lines, including poly adapters, grip nuts, corporation stops, angle meter stops, cathodic protection systems with anode testing, and to remove and replace meter boxes, lids, covers,
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Metal, Car parking, Automotive, Commercial
- Location
- Thousand Oaks, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Thousand Oaks - Polybutylene Service & Valve Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes furnishing all labor, materials, tools, equipment, and incidentals as required by the Specifications and Contract Documents to replace 125 existing polybutylene water services with new copper service lines, including poly adapters, grip nuts, corporation stops, angle meter stops, cathodic protection systems with anode testing, and to remove and replace meter boxes, lids, covers, and perform associated sidewalk repairs; additionally, it involves removal and replacement of 54 ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Thousand Oaks |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Car parking, Automotive, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
