logo
ProjectGc Bidding

THP District 5 Headquarters New Facility

One of 10,000+ projects Taiyo tracks in Tennessee.

Source: Dodge

Project consists of a new, one story, 18,873 square foot slab on grade facility with steel frame, low slope roof, precast and metal exterior wall panels,and CMU and metal stud walls. Framing type contains both CONCRETE & STEEL

Status
Prospective
Sector
Cement, Steel, Metal, Commercial
Location
Fall Branch, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about THP District 5 Headquarters New Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “THP District 5 Headquarters New Facility” is an infrastructure initiative in the Cement sector, located in Fall Branch, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

gc bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project consists of a new, one story, 18,873 square foot slab on grade facility with steel frame, low slope roof, precast and metal exterior wall panels,and CMU and metal stud walls. Framing type contains both CONCRETE & STEEL

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Fall Branch

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Steel, Metal, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project