logo

Three Dogs Bakery - TI (Chandler, AZ)

Sector: Commercial • Location: Chandler, Arizona, United States of America

Source: Dodge USA

Project
Closed

Previously a existing business space (dry cleaners) to be finished into a dog biscuit bakery - mercantile business occupancy. Existing hvac with new distribution. New partition walls, flooring and finishes. Existing electrical power with new distribution. New lighting. Existing sanitary sewer and domestic water stubs to be re-used with new distribution and plumbing connections.

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Residential, Manufacturing (Industrial)
Location
Chandler, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Three Dogs Bakery - TI (Chandler, AZ)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Three Dogs Bakery - TI (Chandler, AZ)” is an infrastructure initiative in the Commercial sector, located in Chandler, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Previously a existing business space (dry cleaners) to be finished into a dog biscuit bakery - mercantile business occupancy. Existing hvac with new distribution. New partition walls, flooring and finishes. Existing electrical power with new distribution. New lighting. Existing sanitary sewer and domestic water stubs to be re-used with new distribution and plumbing connections.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Chandler

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Residential, Manufacturing (Industrial)

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project