Three Greenhouses Upgrade
Sector: Government • Location: Maricopa, Arizona, United States of America
Source: Dodge USA
Complete Rebuild of Greenhouses 719, 726 and 727 at the U.S. Arid Land Agricultural Research Center, Maricopa, Arizona. The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein. Schedule with facilities department. o Replace all electrical (120V and low vol
- Status
- Closed
- Sector
- Government, Commercial, Steel, Power Generation (CCGT), Raw Materials, Metal
- Location
- Maricopa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Three Greenhouses Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Complete Rebuild of Greenhouses 719, 726 and 727 at the U.S. Arid Land Agricultural Research Center, Maricopa, Arizona. The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein. Schedule with facilities department. o Replace all electrical (120V and low voltage) and conduit. o Install new Government supplied self-contained Stainless-Steel Evaporative C... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Maricopa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Steel, Power Generation (CCGT), Raw Materials, Metal |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
