Three Leaf/STH 60 Intersection
Sector: Water Supply and Storage • Location: Slinger, Wisconsin, United States of America
Source: Dodge USA
Approximate quantities are as follows: Excavation Common 1,640 CY \ Base Aggregate Dense 2,100 TON \ HMA Pavement 780 TON \ Concrete Curb & Gutter 680 LF \ Concrete Sidewalk 5-Inch 510 SF \ Signs, Moving Signs Type II Reflective H & Posts 17 EACH \ Marking Line Epoxy 3,870 LF \ Marking Line Grooved Wet Ref Epoxy 10-Inch 760 LF \ Marking Removal Line Water Blasting 4-Inch 680 LF \ Conduit Rigid Non
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Slinger, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Three Leaf/STH 60 Intersection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximate quantities are as follows: Excavation Common 1,640 CY \ Base Aggregate Dense 2,100 TON \ HMA Pavement 780 TON \ Concrete Curb & Gutter 680 LF \ Concrete Sidewalk 5-Inch 510 SF \ Signs, Moving Signs Type II Reflective H & Posts 17 EACH \ Marking Line Epoxy 3,870 LF \ Marking Line Grooved Wet Ref Epoxy 10-Inch 760 LF \ Marking Removal Line Water Blasting 4-Inch 680 LF \ Conduit Rigid Nonmetallic Schedule 40 & Wire 1,225 LF \ Conduit Special 3-Inch 424 LF \ Conduit Loop Detector & Wi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Slinger |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Car parking, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
