logo
ProjectOngoing

Three-phase Redox Flow Battery

Sector: Energy Storage • Location: Spain

Source: EU Funding & Tenders Portal

The high cost and poor performance of certain components of redox flow batteries (RFB) such as the ion-exchange membrane, along with material toxicity, fluctuating prices, and limited availability of vanadium active compounds, are hindering the widespread adoption of RFB in the market. Our 3-Phase-BAT ERC-PoC involves the development of a new type of membrane-free RFB which does not require the us

Status
Under Construction
Sector
Energy Storage
Location
Spain
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Three-phase Redox Flow Battery

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Three-phase Redox Flow Battery” is an infrastructure initiative in the Energy Storage sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The high cost and poor performance of certain components of redox flow batteries (RFB) such as the ion-exchange membrane, along with material toxicity, fluctuating prices, and limited availability of vanadium active compounds, are hindering the widespread adoption of RFB in the market. Our 3-Phase-BAT ERC-PoC involves the development of a new type of membrane-free RFB which does not require the use of any membrane since the electrolytes are separated by thermodynamics eliminating the requirement for a physical barrier. Moreover, the vanadium species are replaced by organic redox compounds that are abundant, less expensive, and present tuneable properties. Specifically, 3-Phase-BAT proposes the use of a three-phase immiscible liquid system, where the top and bottom phases serve as redox electrolytes, separated by an electrochemically “inert” intermediate liquid phase that replaces the costly ion-exchange membrane. This new technology builds upon insights gained from the MFreeB ERC-CoG project, led by Dr. Rebeca Marcilla, devoted to membrane-free RFBs using immiscible biphasic systems. The 3-Phase-BAT ERC-PoC aims to address challenges related to low efficiency and limited energy density by incorporating a third immiscible intermediate phase, effectively preventing the detrimental self-discharge commonly seen in flow battery technology. This ERC-PoC offers a tremendous opportunity to i) validate this novel technology, ii) explore scaling up as part of the technology transfer process, and iii) define an exploitation pathway to transition our 3-Phase-BAT technology from the lab to industry, with the goal of accelerating market access within 5 years.

Location

Country

Spain

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Energy Storage

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project