Three Rivers Phase 2 Construction REBID
Sector: Commercial • Location: Tichnor, Arkansas, United States of America
Source: Dodge USA
PROJECT DESCRIPTION: The work includes construction of a soil-cement containment structure, approximately 2.3 miles in length, associated excavating, riprap installation, installation of the Owens Weir bridge opening, replacement of culverts at La Grues Lake, the removal of the existing Goose Creek Bayou bridge bypass, and all incidental related work. Interested firms must be able to provide all m
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Bridge, Rail, Waste Processing and Treatment, Road
- Location
- Tichnor, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Three Rivers Phase 2 Construction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROJECT DESCRIPTION: The work includes construction of a soil-cement containment structure, approximately 2.3 miles in length, associated excavating, riprap installation, installation of the Owens Weir bridge opening, replacement of culverts at La Grues Lake, the removal of the existing Goose Creek Bayou bridge bypass, and all incidental related work. Interested firms must be able to provide all management, tools, supplies, parts, materials, equipment, transportation, and trained labor necess... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Tichnor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Bridge, Rail, Waste Processing and Treatment, Road |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
