logo

Three Sisters Solar Farm - 300 MW

Sector: Raw Materials • Location: Arizona, United States of America

Source: Dodge

Project
Planning Schematics

A 300 MW photovoltaic (PV) solar facility, 300 MW battery energy storage system (BESS), and a 1.5-mile generation-tie (gen-tie) line on 2,450 acres

Status
Prospective
Sector
Raw Materials, Energy Storage, Power Transmission, Solar, Commercial, Power Generation (CCGT)
Location
Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Three Sisters Solar Farm - 300 MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Three Sisters Solar Farm - 300 MW” is an infrastructure initiative in the Raw Materials sector, located in Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 300 MW photovoltaic (PV) solar facility, 300 MW battery energy storage system (BESS), and a 1.5-mile generation-tie (gen-tie) line on 2,450 acres

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Raw Materials, Energy Storage, Power Transmission, Solar, Commercial, Power Generation (CCGT)

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project