logo
ProjectPlanned

Three Solar PV Plants

The owner, status and timeline of this project. A free account opens every field.

Source: African Energy

Juwi Renewable Energies is set to build and operate three solar PV projects with a total capacity of 340MWp. The generated power will be supplied to mining company Glencore, data group Teraco, and chemical and gas suppliers Sasol and Air Liquide.

Status
Prospective
Sector
Solar, Power Generation (CCGT), Chemical (Industrial), Manufacturing (Industrial)
Location
Cape Town, South Africa
Updated
22 Jul 2026
Source
African Energy

ConstructChat

Ask ConstructChat about Three Solar PV Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Three Solar PV Plants” is an infrastructure initiative in the Solar sector, located in Cape Town, South Africa. Taiyo aggregates data on it from African Energy.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Juwi Renewable Energies is set to build and operate three solar PV projects with a total capacity of 340MWp. The generated power will be supplied to mining company Glencore, data group Teraco, and chemical and gas suppliers Sasol and Air Liquide.

Original sector

Power

Location

Country

South Africa

City

Cape Town

Source

Source

African Energy

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Chemical (Industrial), Manufacturing (Industrial)

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project